Plan
Project structure, BOQ, tasks and Gantt — engineered for construction, not generic PM. Schedules that respect cost codes and float paths.
BauLynq is the operating platform for construction firms — bids, projects, cashflow and site operations on one connected stack. From kickoff to handover, nothing falls through the cracks.
BauLynq replaces the spreadsheet sprawl with a coherent platform — every module owns its slice of the workflow and writes to the same ledger.
Project structure, BOQ, tasks and Gantt — engineered for construction, not generic PM. Schedules that respect cost codes and float paths.
From RFQ to award. Import the BOQ in any layout, price line-by-line, attach subcontractor quotes and ship a clean, traceable submission.
Excel-native progress billing, variations, retentions and certificates — generated the way your QS already works, not how a SaaS wants it.
Site reports, plant & machinery, attendance and payroll closed in one loop — operators on a tablet, controllers in the office, same data.
A construction project doesn’t fail at a stage — it fails at a handover. BauLynq is built around the handovers.
Import the client’s BOQ in any layout. Cost each line against your rate book, distribute to subcontractors, and ship a submission that’s defensible row-by-row.
# 1,247 lines · 14 sections
section "Earthworks"
item A.01 excavation, m³ → $12.40
item A.02 shoring, m² → $48.10
section "Concrete"
…
contract CT-2025-0148
parent_bid: BID-0214
start: 2026-01-12
WBS: auto-from-BOQ
cashflow: derived
The awarded bid becomes the project. WBS, cost codes, baseline schedule and cashflow are generated from the BOQ — no manual re-entry, no reconciliation calls.
Site engineers file daily reports on mobile. Plant moves are logged. Variations are raised against the contract. Everything closes into the project ledger overnight.
2026-03-14 · Crew 04 · Slab S-12
hours: 9.5
pour_m3: 42.3
variations: VAR-0207 (client-requested)
status: on plan
IPC #7 · CT-2025-0148
progress: 62.4%
variations: +$48,120
retention: $31,400
net_due: $214,880
export: excel · pdf
Interim payment certificates assemble themselves from approved progress. Retention, variations and previously certified amounts roll forward — the QS just signs.
Whether you operate a residential tower or a national infrastructure programme, the workflow is the same shape — and BauLynq fits it.
BOQ-driven projects, multi-trade subcontracting, monthly IPCs.
Promotional projects, units, reservations, payment schedules, broker commissions.
Long-cycle works, milestone billing, plant fleets and field crews.
EPC scopes, site instrumentation, controlled handovers, post-handover ops.
“Our month-end used to take ten days of spreadsheets and phone calls. With BauLynq we close in two — and the numbers actually agree .”
Tell us about your portfolio — project types, stack you’re replacing, and the seam that hurts most. We’ll come back with a working session, not a sales call.